Perhubungan

” Infrastruktur – Perhubungan Darat “
 

PANJANG JALAN MENURUT KECAMATAN DAN JENIS PERMUKAAN DI KABUPATEN SIAK, TAHUN 2012 (km)

KECAMATAN JENIS PERMUKAAN JUMLAH
SurfaceType
District ASPAL KERIKIL SEMENISASI TANAH Total
Asphalted Graves Cemented Earth
(1) (2) (3) (4) (5) (6)
1.   SIAK 100.062 31.138 45.161 13.649 190.010
2.   SUNGAI APIT 60.608 24.952 40.435 6.465 132.460
3.   BUNGA RAYA 51.414 23.926 27.800 23.750 126.890
4.   DAYUN 56.287 66.703 16.630 87.500 227.120
5.   KOTO GASIB 40.860 90.610 13.230 52.800 197.500
6.   LUBUK 29.095 58.535 25.180 52.760 165.570
7.   KERINCI 52.470 57.470 13.410 63.870 187.220
8.   TUALANG 89.370 316.862 14.774 55.834 476.840
9.   MINAS 34.540 47.050 14.580 37.230 133.400
10. KANDIS 46.490 78.736 11.227 323.628 460.081
11. SUNGAI 56.954 80.896 11.180 70.050 219.080
12. MEMPURA 82.120 51.850 26.520 10.640 171.130
13. SABAK AUH 36.690 16.700 34.160 9.940 97.490
14. PUSAKO 27.006 34.214 22.120 12.060 95.400
JUMLAH 2012 763.966 979.642 316.407 820.176 2.880.191
Total

 

KONSTRUKSI JEMBATAN , TAHUN 2012 (m)

JENIS JEMBATAN BAIK SEDANG RUSAK RUSAK BERAT JUMLAH
Bridge Type Good Moderate Damage Badly Damage Total
(1) (2) (3) (4) (5) (6)
1. KOTA URUNG-URUNG 523,45 0 0 0 523,45
     Box Culvert
2. GORONG-GORONG 0 0 0 0 0
3. RANGKA BAJA 1.970,00 0 0 0 1.970,00
     Stell Frame
4. BETON 3.380,03 467,59 95,86 11,87 3.955,35
     Concrete
5. BESI LANTAI KAYU 847,4 85,8 0 0 933,2
     Wood Iron Floor
6. KAYU 300 961 311 0 1572
     Wood
JUMLAH 2012 7020,88 1514,39 406,86 11,87 8954
Total
Sumber: Dinas Pekerjaan Umum Kabupaten Siak
linked in share button

Back to Top